PROJECT SCHEDULING ANALYSIS USING CPM AND PERT IN THE CONSTRUCTION OF NAKULA SHOP HOUSES

Authors

  • Ade Yuri Syaban Ramadhan Mathematics, Udayana University Author
  • Caroline Taruliasih Manik Mathematics, Udayana University Author
  • Santi Dwi Zulfa Mathematics, Udayana University Author
  • Ahmad Zarwantoni Mathematics, Udayana University Author
  • Ni Ketut Tari Tastrawati Mathematics, Udayana University Author

Keywords:

Project, CPM, PERT

Abstract

The success of a project is often caused by the lack of planning and control of a project that is less effective, therefore project completion often experiences delays and costs are increasing. In the practice, the duration of project completion is limited in accordance with the mutually agreed upon agreement so that it is necessary to anticipate changes in conditions that will occur. Project management is needed to manage projects to be more optimal by utilizing CPM and PERT. By comparing CPM (Critical Path Method) and PERT (Project Evaluation and Review Technique) in project scheduling on the construction of Ruko Nakula carried out by PT Artha Wijaya Utama, CPM has a faster project completion duration than PERT. The duration required to finish a project with CPM is 49 weeks while PERT requires a duration of 52 weeks.

Downloads

Download data is not yet available.

References

Jannah, SR, Muzdalifah, L., & Kurniawati, EF (2018). Optimization of housing development project scheduling time using Critical Path Method (CPM) / Program Evaluation and Review Technique (PERT) and Monte Carlo Simulation (Case Study of CV. Granada Property). Proceedings of SNasPPM, 3(1).

Dannyanti, E., & Sudaryanto, B. (2011). Optimization of Project Implementation Using PERT and CPM Methods (Case Study of Twin Tower Building, Postgraduate Program, Diponegoro University) (Doctoral dissertation, DIPONEGORO UNIVERSITY).

Maharesi, R. (2002). Project Scheduling by Combining PERT and CPM Methods. Proceedings, Computer and Intelligent Systems (KOMMIT 2002).

Taha, HA (1996). Operations Research. In Jakarta: Bina Rupa Aksara (Vol. 3, Issue 2).

Caesaron, D., & Thio, A. (2017). Time Scheduling Analysis with Critical Path Method and PERT on Shophouse Development Project (Jl. Pasar Lama No. 20 Glodok). JIEMS (Journal of Industrial Engineering and Management Systems), 8(2).

Downloads

Published

2025-04-30

Issue

Section

Articles